Despegue ← Projects RIGI project
The 32 projectsPROJECT ▾
Neuquén
YPF 'LLL Oil' (shale-oil mega-development)Pluspetrol - Bajo del Choique / La InvernadaTecpetrol - Los Toldos II EstePampa Energía - Rincón de ArandaTGS - Natural gas liquids (NGL) project, Tratayén - Bahía BlancaAmpliación Mega - natural gas liquids (NGL)
San Juan
Vicuña (Josemaría + Filo del Sol) — copper, gold and silverEl Pachón - copper, silver and molybdenum (Glencore)Los Azules — copper cathodes (McEwen Copper)Gualcamayo — Deep Carbonates (DCP): gold and silver (Minas Argentinas)Leaching Phases 8 and 9 expansion — Veladero Mine (gold)
Buenos Aires
Fértil Pampa — urea and ammonia plant in Bahía BlancaToyota Zárate — electrified vehicleSidersa Argentine Steel Project — long steel productsOlavarría Wind Farm (P.E. Olavarría) — wind generation (GEAR I / PCR + ArcelorMittal Acindar)
Catamarca
Agua Rica / MARA — copper, gold, silver and molybdenum (Glencore)Salar Tres Quebradas (3Q), stage 2 — lithium carbonate (LIEX/Zijin)Fénix — Phase 1B Expansion: lithium carbonate (Minera del Altiplano / Rio Tinto)Hombre Muerto Oeste (HMW) — lithium carbonate (Galan)
Río Negro
Argentina LNG (YPF, Eni and XRG)Southern Energy - floating LNG (Argentina LNG, Hilli phase)Vaca Muerta Oleoducto Sur (VMOS)San Matías Gas Pipeline (San Matías Pipeline S.A.) - evacuation of Vaca Muerta gas to the Atlantic
Salta
Pozuelos-Pastos Grandes (PPG)Rincón Project — lithium carbonate (Rio Tinto)Diablillos — gold and silver (Salta/Catamarca)Sal de Oro II — lithium carbonate (POSCO)
Mendoza
PSJ Cobre Mendocino (San Jorge) — copper and goldEl Quemado Solar Park and Annexes — photovoltaic generation (Luz del Campo SA / YPF Luz)
Jujuy
Cauchari-Olaroz Expansion — lithium carbonate (Exar)
La Pampa
Perito Moreno Gas Pipeline expansion (ex-GPNK) - TGS
Santa Fe
Timbúes Multipurpose Terminal — port infrastructure (Terminal Timbúes SA)
ESEN
up to date · reviewed Nov 1, 2026
Industry - Automotive/Buenos Aires
approved

Toyota Zárate — electrified vehicle

total investment in the act
1.341USD M
operator
Toyota Argentina S.A.
approving act
Resolución 1848/2026

The first Technology-sector project approved under the RIGI: USD 1,341 million to build a 100% electrified vehicle at Toyota's complex in Zárate, approved by Resolución 1848/2026 (Official Gazette 22-Oct-2026). The official announcement speaks of exports of USD 1,280 million a year, close to 70% of output. Toyota's final investment decision is still pending.

Summary
share among the 28 approved RIGI projectstotal USD 65,353 M
Toyota Zárate2.1%
the other 27USD 64,012 M
what stage it is atpre-construction verif Sep 30, 2026 ↗

How to supply it

what we have for a supplier, and how to request it

If you sell from another province or from abroad

The national floor

The RIGI requires buying at least 20% of goods and works from local suppliers; services are left out of that count. Dec. 749/2024, Anexo I, art. 47 inc. l) verif Aug 23, 2024 ↗

The rest

These rules set a minimum for local suppliers; they do not forbid buying from anyone else. Whatever falls outside the quota is awarded on the offer, and that is where a company from another province or from abroad competes on price, lead time and certifications.

Getting into the quota with a local company

Since Decreto 1366/2026, the RIGI treats as a local supplier any company incorporated and domiciled in Argentina, whatever the origin of its capital. For goods, the product must also meet Mercosur national-origin rules. prob Nov 16, 2026 ↗ See the rule

Does your company fit into Toyota Zárate?

We cross what your company does against the projects we track and tell you which ones it fits into, through which door and who it competes against. Two pages, with the evidence behind them.

Where my company can get in

The project

what it is, the route, the owners, the works and the contractors

Who owns it

Toyota Argentina S.A. verif Sep 30, 2026 ↗

The works, milestone by milestone

Oct 22, 2026admission resolution

Resolución 1848/2026 of the Ministry of Economy approves the RIGI admission of the expansion of a pre-existing project, Technology sector, filed by Toyota Argentina S.A. Sucursal Dedicada (CUIT 30-71944240-0): single project «Plant for the production of electrified vehicles», at Ruta Nacional 12, km 81, Zárate district. Signed 21-Oct-2026; Official Gazette no. 36018 of 22-Oct-2026, page 38.

Sep 30, 2026rigi announcement

The Minister of Economy announces that the Comité Evaluador approved the admission to the RIGI of Toyota's project in Zárate: USD 1,341 million for a 100% electrified vehicle, exports of USD 1,280 million a year, close to 70% of output, more than 3,600 jobs in construction and more than 2,600 in operation, direct and indirect.

Sep 30, 2026company decision

Toyota Argentina states that joining the RIGI allows it to move forward with the final approval process by Toyota, and that the timing of the investment decisions and the production plans will be announced later.

What it leaves in Buenos Aires

jobs, works, taxes, promises and the outlook

How many jobs it creates

In construction

more than 3,600 jobs during construction, direct and indirect combined prob Sep 30, 2026 ↗

In operation

more than 2,600 jobs in operation, direct and indirect combined prob Sep 30, 2026 ↗

How we verified this

the act, the gaps and the sources

The RIGI act, in detail

Act that approves it

Resolución 1848/2026 of the Ministerio de Economía (signed 21-Oct-2026, Official Gazette 22-Oct-2026). verif Oct 22, 2026 ↗

What we could not confirm

There are 3 in this project. Each says why it could not be confirmed and what it would take to close it.

H-01The breakdown of the amount by stage and the eligible investment+

The official record of Resolución 1848/2026 was read, not its recitals: the Official Gazette site was not responding and the full text is not available in the official legislation database.

What would close itThe full Official Gazette notice of 22-Oct-2026, page 38.
H-02When the application was filed+

Neither the minister's announcement nor the company's statement gives the date of the application, and the resolution's recitals that transcribe it could not be read.

What would close itThe recitals of the admission resolution, which transcribe the date of the application.
H-03When the investment is decided and what is bought in the country+

The company says its final approval of the investment is pending and that the timing will be announced later. No works schedule, supplier plan or list of goods to be imported has been published.

What would close itToyota's final decision and the admission resolution, with its commitment to purchase from local suppliers.
First step · free
The first read of your company

We look at what your company does and tell you whether we see a sign that it fits this market, with the evidence behind it. If we do not see one, we say so too and name the condition that would change it. One page as a dated PDF, within 48 working hours.

Not here for a company? Invest · Work (in Spanish) · Start a business (in Spanish) · Institutions
The four projects to start with, in the real analysis of Ebonit S.A.Open the report ↗A real analysis · a real company, open in full →
What this page does not have yet

Not yet documented: The works that stay behind · What it already pays in taxes and royalties · Who promised what · What could stall it · How to tell whether it is advancing.

Ignacio Aredez
Analysis and curation: Ignacio Aredez
Head of Despegue
Method and track record →
  • 20+ years in technology, 15 of them in data and AI, for clients across Europe and the Americas
  • Certified in AI governance (ISO/IEC 42001)
  • Machine Learning (Google Cloud)
  • Registered expert with the European Commission
How to read the seals →
  verif primary source · prob primary source pending · unconf a source said it · estim our own calculation · thesis our reading · the date belongs to the datum, at the precision its source allows
This is not financial advice. The page is built on the act that approved the project and the source of every figure, with the gaps declared. What the company announces is published as an announcement, and what is our own reading is labeled as thesis. ← Back to the projects