TGS - Natural gas liquids (NGL) project, Tratayén - Bahía Blanca
The largest gas-liquids project in Argentine history: a 2.7 M t/yr C3+ fractionation plant and a 573 km/20'' pipeline to Bahía Blanca. It monetizes the liquids from Vaca Muerta gas.
The projectwhat it is, the route, the owners, the works and the contractors
Who owns it
Transportadora de Gas del Sur (TGS) verif · Mar 11, 2026 ↗
What is missing from this fact sheet
Above is what has already passed verification with its source: who operates it, how much it declares it will invest, where it stands under the RIGI and where it is. Still missing are the works milestone by milestone, the contractors, the entry map for suppliers, what it leaves in the province and what could stall it: that is published once it passes the three layers, not before. The project has been announced and has no RIGI accession resolution yet. The works, the awards and the instrument in the Boletín Oficial come later.
How to supply itwhere to register, what they ask for and what they will buy
What it will need and has no supplier for yet
Propane and butane storage and logistics in the window before 2029
highThe project does not come on stream until 2029 or 2030, but the rich gas that will feed it is already being produced: today the chain exports as gas a value that is worth far more downstream. That time gap is the opening, and it is identified in our own midstream analysis: fractionation, propane and butane storage and LPG logistics in the interim window. Whoever builds capacity now uses it during the years when the fractionation plant does not yet exist, and afterwards is positioned as back-up capacity when it starts up.
Pressure vessels and storage spheres fabricated locally
mediumFractionating 2.7 million tonnes of liquids a year requires pressurised and cryogenic tankage: spheres, tanks and pressure vessels with a fabrication code, qualified welding and certified non-destructive testing. It is the highest rung of metalworking and it is exactly where local supply falls short: the province measures that only 27% of contracting goes to certified Neuquén firms against the 60% the rule requires, and pressure vessels are among the first items to be imported. The window is the project's procurement decision, not its operation.
Route and easement management for the pipeline to Bahía Blanca
mediumThe pipeline taking the liquids to Bahía Blanca crosses hundreds of kilometres and more than one jurisdiction, and each stretch is a separate agreement: right of way, crossings of roads, railways and watercourses, permits province by province and compensation to the surface owner. It is pure management work, prior to the first weld, that conditions the entire schedule and that nobody quantifies on the niche map. The window opens with the final investment decision and closes before construction.