Despegue ← Projects Proyecto RIGI
The 31 projectsPROJECT ▾
Neuquén
YPF 'LLL Oil' (shale-oil mega-development)Pluspetrol - Bajo del Choique / La InvernadaTecpetrol - Los Toldos II EstePampa Energía - Rincón de ArandaTGS - Natural gas liquids (NGL) project, Tratayén - Bahía BlancaAmpliación Mega - natural gas liquids (NGL)
San Juan
Vicuña (Josemaría + Filo del Sol) — copper, gold and silverEl Pachón - copper, silver and molybdenum (Glencore)Los Azules — copper cathodes (McEwen Copper)Gualcamayo — Deep Carbonates (DCP): gold and silver (Minas Argentinas)Leaching Phases 8 and 9 expansion — Veladero Mine (gold)
Catamarca
Agua Rica / MARA — copper, gold, silver and molybdenum (Glencore)Salar Tres Quebradas (3Q), stage 2 — lithium carbonate (LIEX/Zijin)Fénix — Phase 1B Expansion: lithium carbonate (Minera del Altiplano / Rio Tinto)Hombre Muerto Oeste (HMW) — lithium carbonate (Galan)
Río Negro
Argentina LNG (YPF, Eni and XRG)Southern Energy - floating LNG (Argentina LNG, Hilli phase)Vaca Muerta Oleoducto Sur (VMOS)San Matías Gas Pipeline (San Matías Pipeline S.A.) - evacuation of Vaca Muerta gas to the Atlantic
Salta
Pozuelos-Pastos Grandes (PPG)Rincón Project — lithium carbonate (Rio Tinto)Diablillos — gold and silver (Salta/Catamarca)Sal de Oro II — lithium carbonate (POSCO)
Buenos Aires
Fértil Pampa — urea and ammonia plant in Bahía BlancaSidersa Argentine Steel Project — long steel productsOlavarría Wind Farm (P.E. Olavarría) — wind generation (GEAR I / PCR + ArcelorMittal Acindar)
Mendoza
PSJ Cobre Mendocino (San Jorge) — copper and goldEl Quemado Solar Park and Annexes — photovoltaic generation (Luz del Campo SA / YPF Luz)
Jujuy
Cauchari-Olaroz Expansion — lithium carbonate (Exar)
La Pampa
Perito Moreno Gas Pipeline expansion (ex-GPNK) - TGS
Santa Fe
Timbúes Multipurpose Terminal — port infrastructure (Terminal Timbúes SA)
ESEN
up to date · reviewed Sep 6, 2026
Energy - photovoltaic power generation (305 MW)/Mendoza
approved

El Quemado Solar Park and Annexes — photovoltaic generation (Luz del Campo SA / YPF Luz)

total investment in the act
211,6USD M
operator
Luz del Campo S.A.
approving act
Resolución 1/2025
what it will need
2procurement fronts

The first project to enter the RIGI: a 305 MW photovoltaic solar park (31.4% capacity factor) in Jocolí (Las Heras, Mendoza), developed by Luz del Campo SA (YPF Luz + EMESA). It is built in two stages; the first installs 200 MW over 350 ha with bifacial panels. It marks the debut of the regime and of one of the few RIGI investments in Mendoza.

Summary
share among the 24 approved RIGI projectstotal USD 42,134 M
El Quemado Solar Park and Annexes0.5%
the other 23USD 41,922 M
what stage it is atoperating verif Jun 6, 2026 ↗

How to supply it

what we have for a supplier, and how to request it

What we have on this project for a supplier

How to get in
1 registration route, with its status · 4 requirements with the rule that sets each one · 5 steps in order, with their timing

Who decides the purchase, who you invoice and where a new supplier registers.

What it buys and when
2 phases, with what each one buys · 1 happening now

Which lines each phase buys and when the window opens for each one.

What it is missing
2 services it will need and has no supplier for yet

Which they are, why it will need them and who could provide them.

Who is already in
3 companies with a contract on the works · 1 with their own purchasing door

Who they are, what each one does and how to sell to them.

All of this is surveyed and verified against its source. Crossed with what you sell —which of them your products suit, how to reach it and when— it is in your company report. Request the report

Does your company fit into El Quemado Solar Park and Annexes?

We cross what you manufacture or do against the 2 phases of this project and tell you which ones you fit into and when each one buys. Two pages, with the evidence behind them.

Where my company can get in

The project

what it is, the route, the owners, the works and the contractors

Who owns it

Luz del Campo S.A. (single-project vehicle, CUIT 30-71765521-0), a company 100 % controlled by YPF Energía Eléctrica S.A. (YPF Luz) verif Jul 13, 2026 ↗

The works, milestone by milestone

Jun 6, 2026full operation

The park obtains commercial authorisation for its final 105 MW and reaches full commercial operation of all 305 MW.

May 14, 2026inauguration

Mendoza’s governor, YPF’s chairman and the Chief of Staff inaugurate the park, which ended up with 305 MW of total installed capacity.

Apr 22, 2026stage iii expansion

The ENRE publicises the access and expansion request for stage III, 105 additional MW: one 220 kV bay, a third 125 MVA transformer, a third 33 kV bus and its reactor.

Feb 25, 2026second 100 mw

CAMMESA authorises commercial operation of an additional 100 MW.

Dec 22, 2025first 100 mw

CAMMESA authorises the start of commercial operation of up to 100 MW. It is the first RIGI project to reach commercial operation.

Jul 21, 2025grid access

The ENRE publicises the access request and the application for a Certificate of Public Convenience and Necessity to build the El Quemado 220/33 kV substation, filed by Distrocuyo at Luz del Campo's request, to connect 200 MW.

Jan 8, 2025rigi approval

The Ministry of Economy approves the accession through Resolución 1/2025: it is the first project approved under the RIGI in the country.

Dec 16, 2024rigi application

Luz del Campo S.A. files its application to join the RIGI.

Sep 25, 2024work begins

The province announces that construction of the first stage starts in October 2024, with more than 350 people at peak and an 18-month schedule.

Aug 27, 2024provincial accession

Mendoza's Official Gazette publishes Ley 9567, by which the Province joins the RIGI. Passed on August 13, 2024, it has three articles and sets no conditions on the companies that join.

Jul 15, 2024board approval

YPF Energía Eléctrica's board approves construction of El Quemado's first phase through its subsidiary Luz del Campo S.A., with 305 MW of installed capacity and an estimated investment of USD 210 million.

What it leaves in Mendoza

jobs, works, taxes, promises and the outlook

How many jobs it creates

In construction

More than 350 people at peak construction, with 87 % local labour. prob May 15, 2026 ↗

The works that stay behind

The infrastructure that stays standing once the works end, with its size and its source.

El Quemado 220/33 kV substation, with gas-insulated technology

Power
no figureTwo 220 kV line entry and exit bays, two transformer bays and one bus-coupling bay; two 220/33 kV transformers of 115 MVA each; a 33 kV yard with a switchgear line-up and longitudinal coupling between bus sections; and an artificial neutral reactor in each 33 kV bus section

Cuyo's transmission system. The substation is a new node on the 220 kV trunk line linking Cruz de Piedra with San Juan, and it remains under the jurisdiction and operation of Distrocuyo, the regulated transmission company: it is not a private installation of the park. Any generator that from now on wants to connect to that corridor has a connection point that did not exist before.

Listed piece by piece in article 1 of Resolución ENRE 498/2025, which publicises the request for a Certificate of Public Convenience and Necessity for its construction.

Sectioning of the 220 kV Cruz de Piedra – San Juan high-voltage line

Power
no figureThe existing trunk line is split into two sections: Cruz de Piedra – El Quemado on one side and El Quemado – San Juan on the other

The electricity corridor between Mendoza and San Juan. It is a permanent change to infrastructure that already existed and does not belong to the project: the route is left with an intermediate node, which is what enables injection and also what changes the protection and switching scheme of the whole section.

Verbatim from subsection b) of article 1 of Resolución ENRE 498/2025: «Seccionamiento de la línea LAT 220 kV Cruz de Piedra - San Juan para interconectar la nueva ET El Quemado, quedando conformadas las LAT Cruz de Piedra - El Quemado por un lado y El Quemado - San Juan por el otro».

Expansion of the El Quemado substation for the third stage

Power
no figureOne 220 kV transformer bay; a third 220/33 kV transformer of 125 MVA; a third 33 kV bus with an additional switchgear line-up; and an artificial neutral reactor on that last bus

The same node on the trunk network, with expanded transformation capacity. The third transformer is 125 MVA, larger than the first two at 115 MVA.

Listed in article 1 of Resolución ENRE 218/2026, which processes the access and expansion for «la Etapa III de su Parque Solar Fotovoltaico (PSFV) El Quemado de 105 MW adicionales» — stage III of the solar park, 105 additional MW.

New access from National Route 40, with a right of way

Roads
no figureNew entry point on National Route 40 at kilometre 3,352.5, four km southeast of the park site

The access was built over a right of way created for the purpose, on land whose registered owner is Mendoza's Departamento General de Irrigación. It remains as the entrance to a site of more than 600 hectares in an area with no prior road.

Verbatim from the owner's community report: «un usufructo del terreno en el cual se instalará el Parque y una servidumbre de paso para el nuevo acceso desde la RN 40» was created — a usufruct over the land and a right of way for the new access from Route 40 — and the park sits «a 4 km al Noroeste de un nuevo punto de ingreso sobre RN 40, aproximadamente en el km 3.352,5 de ésta».

Pending · 2 blocks
  • What it already pays in taxes and royalties — We have not broken down this project’s local fiscal contribution: the primary source that sets each item still has to be opened, and an act of the State is not published on press backing.
  • Who promised what — We have not surveyed the public promises about this project. A dated, verifiable commitment with its source closes them.

What could stall it

risks and how to track them
Pending · 2 blocks
  • What could stall it — We have not documented this project’s risks. An identifiable vector with its source closes them.
  • How to tell whether it is advancing — We have not defined this project’s indicators: what observable fact marks its progress still has to be identified.

How we verified this

the act, the gaps and the sources

The RIGI act, in detail

Administrative file number

EX-2024-117037596-APN-SCEYM#MEC verif Jan 8, 2025 ↗

Accession date

Dec 16, 2024 verif Jan 8, 2025 ↗

The act’s articles, in detail

4 facts on the commitment
Local content set by the act

55,5 % of the amount earmarked for suppliers that goes to LOCAL suppliers (own calculation) estim Jan 8, 2025

What that local content is calculated on

The project's total investment (USD 211,600,072), which in this act matches the sum of what is earmarked for local and foreign suppliers verif Jan 8, 2025 ↗

Deadline for the commitment

30 January 2027 to complete the minimum investment amount. verif Jan 30, 2027 ↗

Vehículo de Proyecto Único

Luz del Campo S.A., tax ID 30-71765521-0, registered at Macacha Güemes 515, Floor 3, Buenos Aires City. verif Jan 8, 2025 ↗

What we could not confirm

There are 4 in this project. Each says why it could not be confirmed and what it would take to close it.

H-01How many people stay on to run the park+

No source publishes it, and now we know why the figure would be small: the park is run remotely from YPF Luz's Remote Operations Centre in Puerto Madero, and on site there is only «personnel carrying out operational support and general maintenance», with no number given. The SEC F-1 filing gives no headcount per asset either. The construction figure — more than 350 people at peak — exists and is on file, but mixing it with the operating figure is exactly the error the `empleo` field exists to prevent.

What would close itA YPF Luz sustainability report breaking headcount down by asset, or a statement from the owner giving the on-site figure.
H-02The text of the provincial environmental licences, Resoluciones 156/2024 and 007/2025+

The owner's community report names them — «Las Resoluciones 156/2024 y 007/2025 constituyen las Licencias Ambientales a favor de LUZ DEL CAMPO S.A.», under Mendoza's Ley provincial 5961/92 — but their text was not found in Mendoza's Official Gazette nor through search. This is an ACCESS gap, not a question of existence. ⚠️ Two independent research passes declared it open separately, which points to the document not being indexed rather than to a poor search.

What would close itThe file at Mendoza's Environment Secretariat, or the edition of the provincial Official Gazette where each resolution was published. It matters because the environmental permit is where the requirements that fall on the contractor usually live, with the name and number of the rule.
H-03Who bid for the work and at what price+

There is no tender document, no bidder list, no contract amount and no ranking. The tender is the owner's private process: there is no state act to open, so this gap is not «I have not found it yet» but «it cannot exist in a public source» unless the company publishes it itself.

What would close itFor the owner or the contractor to publish the amount, which neither has done.
H-04Where DQD, the mounting contractor, is from+

The province's official press refers to «a company with Uruguayan capital» without naming it, and other press pieces place DQD as a San Juan SME. Neither version has a primary source. It is left open rather than picked, because the contractor's origin is precisely what measures how much of the project the province captures.

What would close itDQD's articles of incorporation or company registration, or a statement from the owner identifying it by full corporate name.
First step · free
The first read of your company

We look at what your company does and tell you whether we see a sign that it fits this market, with the evidence behind it. If we do not see one, we say so too and name the condition that would change it. One page as a dated PDF, within 48 working hours.

Not here for a company? Invest · Work (in Spanish) · Start a business (in Spanish) · Institutions
Page 1 of the example executive summaryOpen the report ↗A real analysis · a real company, open in full →
Ignacio Aredez
Analysis and curation: Ignacio Aredez
Head of Despegue
Method and track record →
  • 20+ years in technology, 15 of them in data and AI, for clients across Europe and the Americas
  • Certified in AI governance (ISO/IEC 42001)
  • Machine Learning (Google Cloud)
  • Registered expert with the European Commission
How to read the seals →
  verif primary source · prob primary source pending · unconf a source said it · estim our own calculation · thesis our reading · the date belongs to the datum, at the precision its source allows
This is not financial advice. The page is built on the act that approved the project and the source of every figure, with the gaps declared. What the company announces is published as an announcement, and what is our own reading is labeled as thesis. ← Volver a los proyectos