Despegue ← Projects Proyecto RIGI
The 31 projectsPROJECT ▾
Neuquén
YPF 'LLL Oil' (shale-oil mega-development)Pluspetrol - Bajo del Choique / La InvernadaTecpetrol - Los Toldos II EstePampa Energía - Rincón de ArandaTGS - Natural gas liquids (NGL) project, Tratayén - Bahía BlancaAmpliación Mega - natural gas liquids (NGL)
San Juan
Vicuña (Josemaría + Filo del Sol) — copper, gold and silverEl Pachón - copper, silver and molybdenum (Glencore)Los Azules — copper cathodes (McEwen Copper)Gualcamayo — Deep Carbonates (DCP): gold and silver (Minas Argentinas)Leaching Phases 8 and 9 expansion — Veladero Mine (gold)
Catamarca
Agua Rica / MARA — copper, gold, silver and molybdenum (Glencore)Salar Tres Quebradas (3Q), stage 2 — lithium carbonate (LIEX/Zijin)Fénix — Phase 1B Expansion: lithium carbonate (Minera del Altiplano / Rio Tinto)Hombre Muerto Oeste (HMW) — lithium carbonate (Galan)
Río Negro
Argentina LNG (YPF, Eni and XRG)Southern Energy - floating LNG (Argentina LNG, Hilli phase)Vaca Muerta Oleoducto Sur (VMOS)San Matías Gas Pipeline (San Matías Pipeline S.A.) - evacuation of Vaca Muerta gas to the Atlantic
Salta
Pozuelos-Pastos Grandes (PPG)Rincón Project — lithium carbonate (Rio Tinto)Diablillos — gold and silver (Salta/Catamarca)Sal de Oro II — lithium carbonate (POSCO)
Buenos Aires
Fértil Pampa — urea and ammonia plant in Bahía BlancaSidersa Argentine Steel Project — long steel productsOlavarría Wind Farm (P.E. Olavarría) — wind generation (GEAR I / PCR + ArcelorMittal Acindar)
Mendoza
PSJ Cobre Mendocino (San Jorge) — copper and goldEl Quemado Solar Park and Annexes — photovoltaic generation (Luz del Campo SA / YPF Luz)
Jujuy
Cauchari-Olaroz Expansion — lithium carbonate (Exar)
La Pampa
Perito Moreno Gas Pipeline expansion (ex-GPNK) - TGS
Santa Fe
Timbúes Multipurpose Terminal — port infrastructure (Terminal Timbúes SA)
ESEN
up to date · reviewed Oct 3, 2026
Mining - Copper and gold/Mendoza
approved

PSJ Cobre Mendocino (San Jorge) — copper and gold

regime-eligible assets
613USD M
operator
Minera San Jorge S.A.
approving act
Resolución 801/2026
what it will need
2procurement fronts

First Mendoza copper project in the RIGI: a political-regulatory milestone for a province where metal mining had historically been blocked (Ley 7722). Employment estimated by the press: +6,300 direct and indirect jobs.

Summary
share among the 24 approved RIGI projectstotal USD 42,134 M
PSJ Cobre Mendocino1.5%
the other 23USD 41,521 M
what stage it is atpre-construction verif Sep 2, 2026 ↗

How to supply it

what we have for a supplier, and how to request it

What we have on this project for a supplier

How to get in
3 registration routes, with their status · 5 requirements with the rule that sets each one · 5 steps in order, with their timing

Who decides the purchase, who you invoice and where a new supplier registers.

What it buys and when
3 phases, with what each one buys · 1 happening now

Which lines each phase buys and when the window opens for each one.

What it is missing
2 services it will need and has no supplier for yet

Which they are, why it will need them and who could provide them.

Who is already in
6 companies with a contract on the works

Who they are, what each one does and how to sell to them.

All of this is surveyed and verified against its source. Crossed with what you sell —which of them your products suit, how to reach it and when— it is in your company report. Request the report

Does your company fit into PSJ Cobre Mendocino?

We cross what you manufacture or do against the 3 phases of this project and tell you which ones you fit into and when each one buys. Two pages, with the evidence behind them.

Where my company can get in

The project

what it is, the route, the owners, the works and the contractors

Who owns it

Minera San Jorge S.A. (CUIT 30-69228382-8), the project vehicle, controlled by Zonda Metals GmbH (Switzerland) and Grupo Alberdi (Argentina) prob ↗

The works, milestone by milestone

Sep 2, 2026baseline studies

Work starts on updating the environmental and social baseline, across more than 160 measurement sites, in the pre-construction stage.

May 28, 2026rigi approval

The Ministry of Economy approves the accession through Resolución 801/2026, with eligible assets of USD 613,430,234 and a commitment of 27 % local supplier purchasing.

May 13, 2026rigi application

Minera San Jorge files its application to join the RIGI.

Feb 13, 2026technical teams

The owner announces the feasibility-update teams: some 300 specialists from six Mendoza companies, and a pledge that «at least 90% of contracts» go to companies from the province.

Dec 17, 2025power agreement

The owner and Distrocuyo sign the agreement for the engineering studies of the San Jorge 220/33 kV substation and the 220 kV line to the Mendoza Norte substation.

Dec 11, 2025publication

Ley 9684 is published in Mendoza's Official Gazette No. 32493, alongside Ley 9685, which approves another twenty-seven mining Environmental Impact Declarations.

Dec 10, 2025enactment

The governor enacts the law through Decreto 2783: «Téngase por Ley de la Provincia la Sanción N° 9684».

Dec 9, 2025legislative ratification

Mendoza's Legislature passes Ley 9684, approving the Environmental Impact Declaration and making it binding. It is the first metalliferous project ratified by the Legislature since Ley 7722.

Oct 28, 2025environmental ruling

The Mining Directorate and the Environmental Management and Oversight Directorate issue the Environmental Impact Declaration through Joint Resolution 405/25 and 71/25: 162 articles of conditions.

Aug 2, 2025public hearing

The project's public hearing is held, with what the province itself describes as historic turnout.

Jan 1, 2025environmental report

Minera San Jorge files its Environmental Impact Report, prepared by GT Ingeniería, opening file EX-2025-00278264-GDEMZA-MINERIA.

What it leaves in Mendoza

jobs, works, taxes, promises and the outlook

How many jobs it creates

In construction

3,900 direct and indirect jobs in the construction stage ⚠️ COMBINED figure of direct and indirect jobs, with no published breakdown verif Feb 17, 2025 ↗

In operation

2,400 direct and indirect jobs during an operating phase estimated at 16 years ⚠️ COMBINED figure of direct and indirect jobs, with no published breakdown verif Feb 17, 2025 ↗

The place where it is built

Las Heras, Mendoza, before the RIGI: the official snapshot of November 2023, counting the people who live there.

Registered jobs held by people who live there

46,697 jobs in November 2023, 38% of them in public administration verif Nov 2023 ↗

Miners and construction workers who live there

2,411 jobs: 199 in mining and 2,212 in construction verif Nov 2023 ↗

Miners who live there, 2018 versus 2023

from 180 to 199 jobs verif Nov 2023 ↗

Lodging businesses with employees in the department

22 in 2022 verif 2022 ↗

Mining wage versus public-sector wage

5.3 times estim Nov 2023

The works versus the place

0.1 times all registered jobs in the department and 1.6 times its miners and construction workers estim Nov 2023

The works that stay behind

The infrastructure that stays standing once the works end, with its size and its source.

San Jorge 220/33 kV substation and a 220 kV high-voltage line to the Mendoza Norte substation

Power
no figureA 220/33 kV substation plus a 220 kV line linking it to the Mendoza Norte substation, tying into the province's central electrical ring. ⚠️ The line's length has not been published

The electricity system of Mendoza's high mountain area. According to both parties, the work improves the quality, stability and capacity of the supply in Uspallata — a long-standing demand of residents and the tourism sector — and does not only feed the mine. It stays on Distrocuyo's side, a regulated transmission company, not the project's.

Agreement signed on December 17, 2025 between the owner and Distrocuyo to start the basic engineering studies. Verbatim from the coverage: «El convenio contempla la construcción de la Estación Transformadora San Jorge (220/33 kV) y una Línea de Alta Tensión de 220 kV que la conectará con la Estación Mendoza Norte, integrándose al anillo eléctrico central de la provincia».

Network of hydro-meteorological stations with telemetry

Other
no figureAt least four stations, sited according to the microclimatic variation of the direct and indirect area of influence, tied into the telemetry data network

The public monitoring system. The network feeds into the provincial telemetry data network and is paid for entirely by the company: article 6 of the Environmental Impact Declaration charges it with «la construcción y mantenimiento de la infraestructura de monitoreo (incluyendo pozos exploratorios, estaciones hidrometeorológicas y la instrumentación para el sistema de telemetría en tiempo real)». In an area with no dense weather coverage, that is new public data.

Verbatim from article 56 of the Environmental Impact Declaration: «La Empresa debe presentar ante la AAM para su evaluación y resolución un plan para instalar una red de al menos cuatro estaciones hidrometeorológicas, cuya ubicación responda a las variaciones microclimáticas del área de influencia directa e indirecta del proyecto. Dicha red debe estar integrada a la red de datos telemétricos».

Permanent community relations office in Uspallata

Social
no figureOne office, open through the construction, operation and closure stages, with a monthly updated log of developments

The residents of Uspallata and the local authorities: it is the physical door for direct contact and access to project information, and for that reason it is also the counter a local supplier with no contact inside the company can walk up to.

Verbatim from article 33 of the Environmental Impact Declaration: «La Empresa debe mantener una oficina de relaciones con la comunidad y autoridades locales en Uspallata durante las etapas de construcción, operación y cierre, para facilitar el contacto directo y el acceso a la información sobre el proyecto. En dicha oficina, La Empresa debe mantener un registro mensual actualizado de las novedades en la zona del Proyecto».

Access and signage works on National Route 149 and Provincial Route 52

Roads
no figureExecutive design of the site access and of every work within the right of way of National Route 149, plus a vertical signage plan on National Route 149 and Provincial Route 52, including the «CURVA PASANDO LA JUANITA»

Traffic on both roads. The works and the signage are approved by the 4th District of the National Roads Directorate and sit on public carriageway: anyone driving through uses them, not just the project's trucks.

Verbatim from articles 112 and 113 of the Environmental Impact Declaration: the proponent «deberá presentar ante el 4° Distrito – Mendoza (DNV), el Proyecto Ejecutivo del proyecto de acceso al emprendimiento, como también de todas las obras a realizar dentro de la zona de camino de la Ruta Nacional N° 149», and a vertical signage plan «sobre la calzada de la RNN° 149 y RPN° 52».

Lined tailings storage facility, waste rock dumps and open pit

Other
no figureThe facility must be fully lined, with the design approved beforehand by the Mining Environmental Authority; the technique stated by the owner is thickened tailings

No one, and saying so is part of an honest inventory: these are the liabilities left in the territory once the project ends. The Environmental Impact Declaration treats them as such — it requires safe technical and environmental closure, a specific closure plan filed with the Departamento General de Irrigación, and a post-closure monitoring programme «llevado a cabo por al menos 10 años, con monitoreo semestral obligatorio». It is the physical flip side of the infrastructure that does serve someone.

Article 72 of the Environmental Impact Declaration requires the tailings storage area to be lined with a design approved beforehand, and articles 147 and 156 require safe technical and environmental closure of the facility, the waste rock dumps, the pit and the water infrastructure. Article 157 sets post-closure monitoring at a minimum of ten years, twice yearly.

Pending · 2 blocks
  • What it already pays in taxes and royalties — We have not broken down this project’s local fiscal contribution: the primary source that sets each item still has to be opened, and an act of the State is not published on press backing.
  • Who promised what — We have not surveyed the public promises about this project. A dated, verifiable commitment with its source closes them.

What could stall it

risks and how to track them
Pending · 2 blocks
  • What could stall it — We have not documented this project’s risks. An identifiable vector with its source closes them.
  • How to tell whether it is advancing — We have not defined this project’s indicators: what observable fact marks its progress still has to be identified.

How we verified this

the act, the gaps and the sources

The RIGI act, in detail

Administrative file number

EX-2025-123845536- -APN-SCEYM#MEC verif May 28, 2026 ↗

Accession date

May 13, 2026 verif May 28, 2026 ↗

The act’s articles, in detail

4 facts on the commitment
Local content set by the act

27 % of the amount earmarked for suppliers that goes to LOCAL suppliers verif May 28, 2026 ↗

What that local content is calculated on

The entire investment amount earmarked for paying suppliers, goods and infrastructure works, during the Project's construction and operation stages verif May 28, 2026 ↗

Deadline for the commitment

1 September 2028 to complete the minimum investment amount. verif Sep 1, 2028 ↗

Vehículo de Proyecto Único

Minera San Jorge S.A. (MSJSA), tax ID 30-69228382-8, registered at 9 de Julio 1190, 3rd floor, Office 3, city of Mendoza. verif May 28, 2026 ↗

What we could not confirm

There are 4 in this project. Each says why it could not be confirmed and what it would take to close it.

H-01The direct/indirect breakdown of the 3,900 construction jobs and the 2,400 in operation+

Both figures on file are sums of direct plus indirect jobs, and the owner itself publishes them that way on its site. The trade press publishes a split of 800 direct and 1,600 indirect for the operating phase, without citing the source document.

What would close itThe Environmental Impact Report filed with Mendoza's Mining Directorate, which is the document the press took the figures from. It sits in file EX-2025-00278264-GDEMZA-MINERIA, entries 02 to 19.
H-02The dimensions of the permanent infrastructure: kilometres of high-voltage line, hectares of the tailings storage facility and flow rate of the water intake+

Neither the Environmental Impact Declaration nor the RIGI ruling publish them: the Declaration regulates conditions, it does not describe the works. The document «Aspectos Claves del Proyecto PSJ Cobre Mendocino», published by Mendoza's own government in December 2025, would carry them, but its file returns 403 from the province's cloud storage, with and without a browser identifier. This is an ACCESS gap.

What would close itThat PDF by another route, or the full Environmental Impact Report from the case file.
H-03Who will build the mine: there is no construction contractor awarded, and it is right that there is none+

The project is in the pre-construction stage, which under the ruling starts in June 2027. All that is awarded today are the six feasibility-update teams, which are on file under `contratistas`. For the main construction contractor there is no tender document, no bidders and no award record: the tender will be the owner's private process.

What would close itNothing for now: the window opens on its own. The permit itself requires each work to be reported to the environmental authority thirty days in advance, so notice will be public before the start.
H-04The size of the Socio-environmental and Environmental Compensation Fund+

Article 10 of the Environmental Impact Declaration creates the Fund, defines its purpose, its form — a trust or other legal vehicle, through a formal agreement between the Company, the Province and the Municipality of Las Heras — and its five-member Executive Committee, but sets NO rate and NO amount. That is left to the agreement.

What would close itThe formal agreement between the company, the province and the municipality, which has not been published yet.
First step · free
The first read of your company

We look at what your company does and tell you whether we see a sign that it fits this market, with the evidence behind it. If we do not see one, we say so too and name the condition that would change it. One page as a dated PDF, within 48 working hours.

Not here for a company? Invest · Work (in Spanish) · Start a business (in Spanish) · Institutions
Page 1 of the example executive summaryOpen the report ↗A real analysis · a real company, open in full →
Ignacio Aredez
Analysis and curation: Ignacio Aredez
Head of Despegue
Method and track record →
  • 20+ years in technology, 15 of them in data and AI, for clients across Europe and the Americas
  • Certified in AI governance (ISO/IEC 42001)
  • Machine Learning (Google Cloud)
  • Registered expert with the European Commission
How to read the seals →
  verif primary source · prob primary source pending · unconf a source said it · estim our own calculation · thesis our reading · the date belongs to the datum, at the precision its source allows
This is not financial advice. The page is built on the act that approved the project and the source of every figure, with the gaps declared. What the company announces is published as an announcement, and what is our own reading is labeled as thesis. ← Volver a los proyectos