Despegue ← Projects Proyecto RIGI
The 31 projectsPROJECT ▾
Neuquén
YPF 'LLL Oil' (shale-oil mega-development)Pluspetrol - Bajo del Choique / La InvernadaTecpetrol - Los Toldos II EstePampa Energía - Rincón de ArandaTGS - Natural gas liquids (NGL) project, Tratayén - Bahía BlancaAmpliación Mega - natural gas liquids (NGL)
San Juan
Vicuña (Josemaría + Filo del Sol) — copper, gold and silverEl Pachón - copper, silver and molybdenum (Glencore)Los Azules — copper cathodes (McEwen Copper)Gualcamayo — Deep Carbonates (DCP): gold and silver (Minas Argentinas)Leaching Phases 8 and 9 expansion — Veladero Mine (gold)
Catamarca
Agua Rica / MARA — copper, gold, silver and molybdenum (Glencore)Salar Tres Quebradas (3Q), stage 2 — lithium carbonate (LIEX/Zijin)Fénix — Phase 1B Expansion: lithium carbonate (Minera del Altiplano / Rio Tinto)Hombre Muerto Oeste (HMW) — lithium carbonate (Galan)
Río Negro
Argentina LNG (YPF, Eni and XRG)Southern Energy - floating LNG (Argentina LNG, Hilli phase)Vaca Muerta Oleoducto Sur (VMOS)San Matías Gas Pipeline (San Matías Pipeline S.A.) - evacuation of Vaca Muerta gas to the Atlantic
Salta
Pozuelos-Pastos Grandes (PPG)Rincón Project — lithium carbonate (Rio Tinto)Diablillos — gold and silver (Salta/Catamarca)Sal de Oro II — lithium carbonate (POSCO)
Buenos Aires
Fértil Pampa — urea and ammonia plant in Bahía BlancaSidersa Argentine Steel Project — long steel productsOlavarría Wind Farm (P.E. Olavarría) — wind generation (GEAR I / PCR + ArcelorMittal Acindar)
Mendoza
PSJ Cobre Mendocino (San Jorge) — copper and goldEl Quemado Solar Park and Annexes — photovoltaic generation (Luz del Campo SA / YPF Luz)
Jujuy
Cauchari-Olaroz Expansion — lithium carbonate (Exar)
La Pampa
Perito Moreno Gas Pipeline expansion (ex-GPNK) - TGS
Santa Fe
Timbúes Multipurpose Terminal — port infrastructure (Terminal Timbúes SA)
ESEN
up to date · reviewed Oct 16, 2026
Mining - Gold and silver/Salta
approved

Diablillos — gold and silver (Salta/Catamarca)

announced investment
764USD M
operator
PACIFIC RIM MINING CORPORATION ARGENTINA S.A.
approving act
Resolución 562/2026
what it will need
3procurement fronts

Gold and silver mining in the puna, on the Salta/Catamarca border area: feasibility development, a 3.15 Mt/yr processing plant and full infrastructure. Official portal: 2,013 jobs (direct and indirect).

Summary
share among the 24 approved RIGI projectstotal USD 42,134 M
Diablillos1.8%
the other 23USD 41,370 M
what stage it is atpre-construction verif Aug 27, 2026 ↗

How to supply it

what we have for a supplier, and how to request it

What we have on this project for a supplier

How to get in
2 registration routes, with their status · 5 requirements with the rule that sets each one · 4 steps in order, with their timing

Who decides the purchase, who you invoice and where a new supplier registers.

What it buys and when
2 phases, with what each one buys · 1 happening now

Which lines each phase buys and when the window opens for each one.

What it is missing
3 services it will need and has no supplier for yet

Which they are, why it will need them and who could provide them.

Who is already in
4 companies with a contract on the works

Who they are, what each one does and how to sell to them.

All of this is surveyed and verified against its source. Crossed with what you sell —which of them your products suit, how to reach it and when— it is in your company report. Request the report

Does your company fit into Diablillos?

We cross what you manufacture or do against the 2 phases of this project and tell you which ones you fit into and when each one buys. Two pages, with the evidence behind them.

Where my company can get in

The project

what it is, the route, the owners, the works and the contractors

Who owns it

PACIFIC RIM MINING CORPORATION ARGENTINA S.A. (CUIT 30-67305977-1) verif May 11, 2026 ↗

The works, milestone by milestone

Aug 27, 2026bridging engineering

AbraSilver issues Worley a limited notice to proceed for the bridging engineering, opening the workstreams needed for the final investment decision, set for the second quarter of 2027. The scope includes planning the construction and operations camp.

Jul 29, 2026financing

AbraSilver closes a public equity offering of C$50 million (C$49,994,700 gross), earmarked to advance Diablillos, including early works and advance purchase of long-lead equipment.

Jun 24, 2026environmental permit

Catamarca approves the project's environmental impact statement, the last major environmental permit it still lacked according to the owner.

Jun 22, 2026feasibility

AbraSilver publishes the results of the definitive feasibility study: a 9,000 t/day plant, a 25-year mine life, USD 722 M of initial capex, a 1,600-person camp to be built after the investment decision, and a grid connection in year 3 of operation.

May 11, 2026official gazette

Resolución 562/2026 is published in the official gazette, approving accession to the RIGI: a 3,150,000 t/yr plant, USD 481.7 M in eligible assets and a commitment of 55% of purchases from local suppliers.

Feb 26, 2026RIGI accession

RIGI accession date set by article 2 of Resolución 562/2026. ⚠️ It is neither the date of the resolution nor of its publication: the resolution sets it retroactively, 70 days before it was signed and 74 before it was published.

Apr 9, 2025engineering award

AbraSilver selects Worley as the engineering contractor for the definitive feasibility study, with the work run from its Canadian and Argentine offices.

What it leaves in Salta

jobs, works, taxes, promises and the outlook

The place where it is built

Los Andes, Salta, before the RIGI: the official snapshot of November 2023, counting the people who live there.

Registered jobs held by people who live there

2,071 jobs in November 2023, 32% of them in public administration verif Nov 2023 ↗

Miners and construction workers who live there

933 jobs: 590 in mining and 343 in construction verif Nov 2023 ↗

Miners who live there, 2018 versus 2023

from 345 to 590 jobs verif Nov 2023 ↗

Lodging businesses with employees in the department

2 in 2022 verif 2022 ↗

Mining wage versus public-sector wage

1.3 times estim Nov 2023

The works that stay behind

The infrastructure that stays standing once the works end, with its size and its source.

Tank leach processing plant, with its tailings storage facility

Productive
9,000

tonnes of ore per day, for a 25-year mine life; US$722 million of initial investment, contingency included

The cooperation zone between Salta and Catamarca: it is the industrial facility that sustains a quarter century of activity in the department, and the study raises a possible expansion of the tailings facility for future mine-plan scenarios.

The definitive feasibility study sets out an open-pit operation with a 9,000 tonnes-per-day tank leach plant, initial capex of USD 722 million —including USD 98 million of contingency— and sustaining capex of USD 520 million over the life of the mine. The tailings facility incorporates a downstream waste-rock buttress, and the study raises as a possibility an expansion of the facility designed for future expansions of the mine plan.

Pending · 2 blocks
  • What it already pays in taxes and royalties — We have not broken down this project’s local fiscal contribution: the primary source that sets each item still has to be opened, and an act of the State is not published on press backing.
  • Who promised what — We have not surveyed the public promises about this project. A dated, verifiable commitment with its source closes them.

What could stall it

risks and how to track them
Pending · 2 blocks
  • What could stall it — We have not documented this project’s risks. An identifiable vector with its source closes them.
  • How to tell whether it is advancing — We have not defined this project’s indicators: what observable fact marks its progress still has to be identified.

How we verified this

the act, the gaps and the sources

The RIGI act, in detail

Administrative file number

EX-2025-129214596- -APN-SCEYM#MEC verif May 11, 2026 ↗

Accession date

Feb 26, 2026 verif May 11, 2026 ↗

The act’s articles, in detail

3 facts on the commitment
Local content set by the act

55 % of the amount earmarked for suppliers that goes to LOCAL suppliers verif May 11, 2026 ↗

What that local content is calculated on

The entire investment amount earmarked for paying suppliers, goods and infrastructure works verif May 11, 2026 ↗

Vehículo de Proyecto Único

Pacific Rim Mining Corporation Argentina S.A., tax ID 30-67305977-1, registered at Balcarce 376, Floor 1, city of Salta. verif May 11, 2026 ↗

What we could not confirm

There are 3 in this project. Each says why it could not be confirmed and what it would take to close it.

H-01How many people the construction employs and how many stay working in operation+

No RIGI admission resolution publishes the figure: the seventeen that are published state that the company «provided the estimate of direct and indirect employment of the Project with local integration» and do not transcribe it. The official RIGI portal publishes a single figure that adds direct and indirect jobs together and does not separate the two stages, and mixing them is exactly the error the `empleo` field exists to prevent.

What would close itThe employment study filed with the application, or a company release splitting the figure into construction and operation.
H-02The permanent infrastructure the project leaves behind+

The definitive feasibility study announces a grid connection in year 3 and a 1,600-person camp, but the release publishes neither the length nor the voltage of the line, nor the kilometres of access road, nor the water system. Without a magnitude an item does not enter the permanent-works block, and the gap is not filled with the Puna's regional infrastructure: the roughly 250 km high-voltage line under discussion for the lithium corridor is a different project, not Diablillos.

What would close itThe full technical report of the feasibility study (NI 43-101, published 21-Jul-2026), which usually does carry the infrastructure magnitudes.
H-03The route of the power connection, the access road and the water system+

The feasibility study publishes that the grid connection arrives in year 3 — until then the project runs on diesel generators — but it does not give the length or the voltage of the line, the kilometers of the access road, or how water is supplied. A work with no magnitude does not enter the inventory of what stays built, so all three are left out until a measurement appears.

What would close itThe full NI 43-101 technical report, filed on SEDAR+ on 20-Jul-2026 with an effective date of 19-Jun-2026. The news release announcing it has been opened; the report itself has not.
First step · free
The first read of your company

We look at what your company does and tell you whether we see a sign that it fits this market, with the evidence behind it. If we do not see one, we say so too and name the condition that would change it. One page as a dated PDF, within 48 working hours.

Not here for a company? Invest · Work (in Spanish) · Start a business (in Spanish) · Institutions
Page 1 of the example executive summaryOpen the report ↗A real analysis · a real company, open in full →
Ignacio Aredez
Analysis and curation: Ignacio Aredez
Head of Despegue
Method and track record →
  • 20+ years in technology, 15 of them in data and AI, for clients across Europe and the Americas
  • Certified in AI governance (ISO/IEC 42001)
  • Machine Learning (Google Cloud)
  • Registered expert with the European Commission
How to read the seals →
  verif primary source · prob primary source pending · unconf a source said it · estim our own calculation · thesis our reading · the date belongs to the datum, at the precision its source allows
This is not financial advice. The page is built on the act that approved the project and the source of every figure, with the gaps declared. What the company announces is published as an announcement, and what is our own reading is labeled as thesis. ← Back to Salta