Despegue ← Projects Proyecto RIGI
The 31 projectsPROJECT ▾
Neuquén
YPF 'LLL Oil' (shale-oil mega-development)Pluspetrol - Bajo del Choique / La InvernadaTecpetrol - Los Toldos II EstePampa Energía - Rincón de ArandaTGS - Natural gas liquids (NGL) project, Tratayén - Bahía BlancaAmpliación Mega - natural gas liquids (NGL)
San Juan
Vicuña (Josemaría + Filo del Sol) — copper, gold and silverEl Pachón - copper, silver and molybdenum (Glencore)Los Azules — copper cathodes (McEwen Copper)Gualcamayo — Deep Carbonates (DCP): gold and silver (Minas Argentinas)Leaching Phases 8 and 9 expansion — Veladero Mine (gold)
Catamarca
Agua Rica / MARA — copper, gold, silver and molybdenum (Glencore)Salar Tres Quebradas (3Q), stage 2 — lithium carbonate (LIEX/Zijin)Fénix — Phase 1B Expansion: lithium carbonate (Minera del Altiplano / Rio Tinto)Hombre Muerto Oeste (HMW) — lithium carbonate (Galan)
Río Negro
Argentina LNG (YPF, Eni and XRG)Southern Energy - floating LNG (Argentina LNG, Hilli phase)Vaca Muerta Oleoducto Sur (VMOS)San Matías Gas Pipeline (San Matías Pipeline S.A.) - evacuation of Vaca Muerta gas to the Atlantic
Salta
Pozuelos-Pastos Grandes (PPG)Rincón Project — lithium carbonate (Rio Tinto)Diablillos — gold and silver (Salta/Catamarca)Sal de Oro II — lithium carbonate (POSCO)
Buenos Aires
Fértil Pampa — urea and ammonia plant in Bahía BlancaSidersa Argentine Steel Project — long steel productsOlavarría Wind Farm (P.E. Olavarría) — wind generation (GEAR I / PCR + ArcelorMittal Acindar)
Mendoza
PSJ Cobre Mendocino (San Jorge) — copper and goldEl Quemado Solar Park and Annexes — photovoltaic generation (Luz del Campo SA / YPF Luz)
Jujuy
Cauchari-Olaroz Expansion — lithium carbonate (Exar)
La Pampa
Perito Moreno Gas Pipeline expansion (ex-GPNK) - TGS
Santa Fe
Timbúes Multipurpose Terminal — port infrastructure (Terminal Timbúes SA)
ESEN
up to date · reviewed Sep 24, 2026
Mining - Gold and silver (Deep Carbonates project)/San Juan
approved

Gualcamayo — Deep Carbonates (DCP): gold and silver (Minas Argentinas)

total investment in the act
519,6USD M
operator
Minas Argentinas SA Dedicated Branch RIGI I-Nuevo Gualcamayo
approving act
Resolución 6/2026
what it will need
2procurement fronts

Reactivation and deepening of the Gualcamayo gold and silver mine (San Juan): the 'Deep Carbonates (DCP)' project extends the mine life toward the sulfide orebody at depth. Company/press figures (probable, outside the resolution): ~4,500 projected direct and indirect jobs; the operator is preparing a 'second RIGI' (~USD 1,500 M) to move from a mine to a mining district.

Summary
share among the 24 approved RIGI projectstotal USD 42,134 M
Gualcamayo1.2%
the other 23USD 41,614 M
what stage it is atpre-construction prob Sep 4, 2026 ↗

How to supply it

what we have for a supplier, and how to request it

What we have on this project for a supplier

How to get in
3 registration routes, with their status · 4 requirements with the rule that sets each one · 5 steps in order, with their timing

Who decides the purchase, who you invoice and where a new supplier registers.

What it buys and when
1 phase, with what it buys · 1 happening now

Which lines each phase buys and when the window opens for each one.

What it is missing
2 services it will need and has no supplier for yet

Which they are, why it will need them and who could provide them.

Who is already in
13 companies with a contract on the works · 2 with their own purchasing door

Who they are, what each one does and how to sell to them.

All of this is surveyed and verified against its source. Crossed with what you sell —which of them your products suit, how to reach it and when— it is in your company report. Request the report

Does your company fit into Gualcamayo?

We cross what your company does against the projects we track and tell you which ones it fits into, through which door and who it competes against. Two pages, with the evidence behind them.

Where my company can get in

The project

what it is, the route, the owners, the works and the contractors

Who owns it

Minas Argentinas SA Dedicated Branch RIGI I-Nuevo Gualcamayo (CUIT 30-71915462-6) verif; controlling group Eris Resource Company / AISA prob verif Jan 15, 2026 ↗

The works, milestone by milestone

Aug 14, 2026works start

An infrastructure works plan of more than USD 15 million and a nine-month schedule begins, to prepare the site for the future development of Carbonatos Profundos: expansion of the mineral processing facilities and the reagent stores, earthworks, geomembrane laying and camp expansion. The main civil works were awarded by tender to the San Juan company Mapal-Sigma. It adds some 230 jobs, on top of a headcount of 327 direct employees and 437 contractor workers at the close of July, bringing the mine close to 1,000 people involved.

Jul 16, 2026provincial regime

Ley provincial 2827-M on Local Mining Development comes into force: from now on, only contracts with suppliers registered and holding a valid certificate in the Provincial Registry of Mining Suppliers count towards the miner's local procurement target verif. This mine's community of influence would be the Jáchal department, where the deposit lies prob, and that is the level at which the law requires 24 months of prior establishment to qualify verif.

Jul 1, 2026second RIGI announced

The controlling group announces in Madrid, before the president, that it is considering filing a second application to the regime for USD 1,500 million — the G50 Programme — to turn the mine into a district: unlocking the potential of the concession's 38,000 hectares, with a short tranche of 24 to 36 months to assess remaining resources and a long one for new sectors, including those with potential for industrial metals. The deposit declares 7.1 million ounces of gold in resources and 4.9 million in certified reserves.

Jan 15, 2026official gazette

Resolución 6/2026 of the Ministerio de Economía is published, approving accession. It declares USD 519,647,635 of total countable investment, with USD 46.7 million in the first year and USD 43.9 million in the second, a deadline of 31 December 2028, and a local procurement commitment of 69 % on the amount allocated to suppliers verif. It is the tenth project approved in the regime prob.

Nov 27, 2025RIGI accession

Accession date to the regime: 27 November 2025. A dedicated branch accedes, Minas Argentinas S.A. Sucursal Dedicada RIGI I-Nuevo Gualcamayo, domiciled in the city of San Juan. The approved object covers three things: exploring the Gualcamayo 1 and 2 concessions, assessing the feasibility of the Carbonatos Profundos gold and silver deposit, and building, commissioning and operating the treatment plant.

What it leaves in San Juan

jobs, works, taxes, promises and the outlook

How many jobs it creates

In construction

230 new jobs for the nine months of the infrastructure works that the company announced would start in August 2026, on top of a workforce of 327 direct workers and 437 contractor workers this is employment for the preliminary site preparation works (expansion of the mineral processing plant and the reagent warehouses, earthworks, geomembranes and camp expansion), not for the construction of the Carbonatos Profundos plant, whose workforce is not published in the sources reviewed prob Aug 14, 2026 ↗

The place where it is built

Jáchal, San Juan, before the RIGI: the official snapshot of November 2023, counting the people who live there.

Registered jobs held by people who live there

6,810 jobs in November 2023, 60% of them in public administration verif Nov 2023 ↗

Miners and construction workers who live there

1,148 jobs: 548 in mining and 600 in construction verif Nov 2023 ↗

Miners who live there, 2018 versus 2023

from 526 to 548 jobs verif Nov 2023 ↗

Lodging businesses with employees in the department

3 in 2022 verif 2022 ↗

Mining wage versus public-sector wage

2.9 times estim Nov 2023

The works that stay behind

The infrastructure that stays standing once the works end, with its size and its source.

New camp sector at the mine, with accommodation modules for four people and private bathroom, plus the relocation of the sports facilities

Social
no figuremore than 38 accommodation modules, each for four people: around 152 new beds

The mine itself and its contractors: it is the accommodation capacity that supports the jump in headcount from some 760 people to close to 1,000, and it stays in place for the construction stage of Carbonatos Profundos.

Verbatim: «la construcción de un nuevo sector de campamento compuesto por más de 38 módulos habitacionales, cada uno con capacidad para cuatro personas y baño privado» — a new camp sector of more than 38 accommodation modules, each for four people with a private bathroom. The programme also includes «el traslado de las instalaciones deportivas y un refuerzo temporal de los servicios de transporte y alimentación».

Expansion of the mineral processing facilities and the reagent stores, with earthworks and geomembrane laying

Productive
no figurepart of a plan of more than USD 15 million executed over nine months from August 2026

The mine's operation: it is the expanded plant on which the future Carbonatos Profundos project is mounted, which is why the company calls it site preparation.

Verbatim: the works «contemplan la ampliación de las instalaciones de beneficio de minerales y de los almacenes de reactivos, movimientos de suelo, despliegue de geomembranas y ampliación de los campamentos», with an estimated duration of nine months and an investment of more than USD 15 million. The general manager frames them as «un avance concreto en los planes de inversión anunciados bajo el RIGI» that allows «anticipar la preparación de nuevas áreas e infraestructura necesarias para el futuro desarrollo del proyecto Carbonatos Profundos».

Mining access road from Ruta Nacional 40 to the camp, along the Gualcamayo river valley

Roads
no figurearound 15 kilometres; the mine is 270 km north of the provincial capital

The Gualcamayo river valley, in the Jáchal department: it is the only access to the camp and it already exists, so what the project adds is maintenance and capacity, not a new alignment.

Verbatim from the accession resolution: «el acceso principal al campamento se inicia en la Ruta Nacional 40 por el camino minero que conduce al Valle del río Gualcamayo, distante quince kilómetros (15 km) aproximadamente» — the main access to the camp starts at Ruta Nacional 40 along the mining road to the Gualcamayo river valley, about fifteen kilometres away. The same resolution places the project «en la región de Gualcamayo, a doscientos setenta kilómetros (270 km) al norte de la capital provincial».

Photovoltaic park on the deposit's land, with the upgrading of the power line and the Huaco transformer station and a link to the national interconnected system

Power
50 MW

in the first stage and 800 MW as the target over a decade; the projected link is 500 kV

First the mine and then the country: the company states that with the upgrade and the link it could sell its output anywhere on the system. The Huaco transformer station is provincial infrastructure, not the deposit's.

Verbatim from the operator's own site: «En una primera etapa se instalarán paneles solares para producir 50 MW. A lo largo de la siguiente década, la construcción crecerá de manera escalonada hasta alcanzar los 800 MW. Repotenciando la línea eléctrica y la Estación Transformadora Huaco —y construyendo o participando en un enlace en 500 kV que complete la vinculación con el Sistema Interconectado Nacional— podremos vender la producción a cualquier parte del país» — a first 50 MW stage growing in steps to 800 MW over the decade, with the power line and the Huaco transformer station upgraded and a 500 kV link that would allow selling output anywhere in the country.

Pending · 2 blocks
  • What it already pays in taxes and royalties — We have not broken down this project’s local fiscal contribution: the primary source that sets each item still has to be opened, and an act of the State is not published on press backing.
  • Who promised what — We have not surveyed the public promises about this project. A dated, verifiable commitment with its source closes them.

What could stall it

risks and how to track them
Pending · 2 blocks
  • What could stall it — We have not documented this project’s risks. An identifiable vector with its source closes them.
  • How to tell whether it is advancing — We have not defined this project’s indicators: what observable fact marks its progress still has to be identified.

How we verified this

the act, the gaps and the sources

The RIGI act, in detail

Administrative file number

EX-2025-61508153- -APN-SCEYM#MEC verif Jan 15, 2026 ↗

Accession date

Nov 27, 2025 verif Jan 15, 2026 ↗

The act’s articles, in detail

4 facts on the commitment
Local content set by the act

69 % of the amount earmarked for suppliers that goes to LOCAL suppliers verif Jan 15, 2026 ↗

What that local content is calculated on

The entire investment amount earmarked for paying suppliers, goods and infrastructure works, during the construction and operation stages verif Jan 15, 2026 ↗

Deadline for the commitment

31 December 2028 to complete the minimum investment amount. verif Dec 31, 2028 ↗

Vehículo de Proyecto Único

Minas Argentinas S.A. Sucursal Dedicada RIGI I-Nuevo Gualcamayo (MASA-SD), tax ID 30-71915462-6, registered at Av. Ignacio de la Roza Oeste 2613, Capital department, San Juan. verif Jan 15, 2026 ↗

What we could not confirm

There are 5 in this project. Each says why it could not be confirmed and what it would take to close it.

H-01The workforce for the construction of the Carbonatos Profundos plant and for its operation+

What is published, and loaded here, is the previous step: 230 jobs for nine months of infrastructure works. For the big stage —the construction of the plant— there is no figure in an accessible source, and Resolución 6/2026 does not publish employment.

What would close itThe Carbonatos Profundos feasibility study, or a Minas Argentinas release with the workforce by stage.
H-02The amount of the civil works contract and who competed for it+

The operator reported that there was a tender and who won it, but published neither the awarded amount nor the list of bidders. It is a company's private tender, so there is no gazette where it has to appear.

What would close itA release from the winning bidder with the scope and the amount, or the project page in its own portfolio.
H-03Which service each of the twelve companies the operator listed actually provides+

The source publishes the names as a block and the categories as a block — hospitality, transport, security, drilling, health and construction — without crossing them. Assigning a category to each name by resemblance would be inventing it. The only one with a category from its own source is Caterwest, through an earlier article already recorded in the repository.

What would close itThe operator's own supplier list, or articles from each company declaring its contract with the mine.
H-04How the community contribution percentage is set within the 1 % to 5 % band+

The source publishes the names as a block and the categories as a block — hospitality, transport, security, drilling, health and construction — without crossing them. Assigning a category to each name by resemblance would be inventing it. The only one with a documented category is Caterwest, and what supports it is an earlier article about its catering capacity, not this list.

What would close itMinas Argentinas' supplier contract template, or the rulebook of its Community Development Programmes.
H-05How many hectares the project has: 7,128 or 38,000+

Two corporate sources give figures that do not match. The consultancy doing the engineering publishes a project area of 7,128 hectares; the controlling group speaks of 38,000 hectares of concession when announcing the second filing. They may be two different things — the disturbed area versus the total concession — but neither of them says so, and without that the larger number cannot be published as the project's area.

What would close itThe mining concession title or the environmental impact report, which state the area precisely.
First step · free
The first read of your company

We look at what your company does and tell you whether we see a sign that it fits this market, with the evidence behind it. If we do not see one, we say so too and name the condition that would change it. One page as a dated PDF, within 48 working hours.

Not here for a company? Invest · Work (in Spanish) · Start a business (in Spanish) · Institutions
Page 1 of the example executive summaryOpen the report ↗A real analysis · a real company, open in full →
Ignacio Aredez
Analysis and curation: Ignacio Aredez
Head of Despegue
Method and track record →
  • 20+ years in technology, 15 of them in data and AI, for clients across Europe and the Americas
  • Certified in AI governance (ISO/IEC 42001)
  • Machine Learning (Google Cloud)
  • Registered expert with the European Commission
How to read the seals →
  verif primary source · prob primary source pending · unconf a source said it · estim our own calculation · thesis our reading · the date belongs to the datum, at the precision its source allows
This is not financial advice. The page is built on the act that approved the project and the source of every figure, with the gaps declared. What the company announces is published as an announcement, and what is our own reading is labeled as thesis. ← Back to San Juan