Despegue REFORMS ESEN
up to date · reviewed Jul 15, 2026
The norm, in detail

Mature areas: 6% royalties for 2 years to revive conventional output

Decreto 13/26 (Official Gazette 6458)
in executionPROVINCIAL Energy and natural resources

Decreto 13/26 ends the Medianera and Rinconada concessions, puts them out to tender and cuts royalties from 15% to 6% during the continuity plan.

What changed and who it applies to

What changed
It terminates the concessions of the 'Medianera' and 'Rinconada - Puesto Morales' areas and approves National and International Public Tender 02/25 to reassign them (together with Las Bases, forfeited by President Petroleum). The incentive: during the Operational Continuity Plan (2 years) the royalty drops from 15% to 6% (textual mechanics: '15% + X, where X = -9%'), and the remaining 8-year period carries royalties tied to the area's potential; the surface fee can be offset against remediation of pre-existing environmental liabilities. Declared objective: operational and employment continuity over revenue. verif Jan 8, 2026
In force
Awarded by Decreto 548/26 (Official Gazette 6494, 28-May-2026): 'Medianera' and 'Rinconada-Puesto Morales' went to Geopetrol Drilling S.A. for 10 years from contract signing, with approved plans totalling USD 6.17 M (Medianera USD 0.605 M continuity + USD 1.625 M development; Rinconada-PM USD 1.4 M + USD 2.54 M). 'Las Bases' was declared VACANT (no bidders at the 27-Feb-26 opening) and remains under provincial administration. verif May 28, 2026
Are you in or out?
Conventional-oil SMEs (Geopetrol, Petrolsur and the Titanium-Emepa joint venture competed; the latter did not qualify) and oil employment in Catriel and the province's northwest, hit by the decline of mature fields (municipal labor emergency Res. 35/2025). verif May 28, 2026
The norm
Decreto 13/26 (DECTO-2026-13-E-GDERNE-RNE), Viedma, Jan 8, 2026; published in Boletín Oficial 6458 of Jan 15, 2026. File 202.314-SEyA-2.2025. verif Jan 15, 2026

Our reading

The realistic flip side of the corridor: while shale and midstream grow, the old conventional is sustained by lowering the entry price (6% royalty, surface fee offsettable against remediation). It is continuity policy, not rent policy - the decree's own recitals say so: 'sustaining the viability of the associated economies' matters more than the bonus. For small investors it is an entry door into upstream with cheap producing assets; the risk is inheriting environmental liabilities that the fee offset only partially covers. thesis

Where it lands, province by province1

Río Negro It keeps the conventional services fabric (Catriel) alive during the transition to the corridor: without operators in the mature areas, oil employment in the province's northwest falls before midstream operations can offset it. favorable thesis

The other rules on this subject38

Energy: free export of hydrocarbons and gasDecretos 1057/2024 and 1060/2024in force
The State reorders the trunk gas pipelines and forces firm transportation contracts to be redrawnRes. SE 66/2026 (Official Gazette, Mar 13, 2026) + Res. ENARGAS 409/2026in execution
Hydrocarbons: the pre-export local offer fallsSE Res. 166/2026 (Official Gazette, Jul 22, 2026)in force
The State puts 16 high-voltage works out to tender, and six of them run through four of the five provincesRes. SE 202/2026 (Official Gazette, Aug 12, 2026), the Plan's first workin execution
The Comahue returns to private hands: 4 dams awardedRes. 2124/2025, Ministry of Economy (Official Gazette Dec 30, 2025)in force
End of segmentation: energy subsidies are targeted at those who need themDecreto 943/2025 (Official Gazette, Jan 2, 2026)in force
Ignacio Aredez
Ignacio Aredez· Chief analyst
Credentials and track record →
  • 10+ years in data science for clients across Europe and the Americas
  • Certified in AI governance (ISO/IEC 42001)
  • Machine Learning (Google Cloud)
  • Registered expert with the European Commission
How to read the seals →   verif primary source · prob primary source pending · unconf a source said it · estim our own calculation · thesis our reading · the date belongs to the datum, at the precision its source allows
Fact sheet built on the published rule, with the gaps declared. Back to the reforms
Write to us · free

Get on board the takeoff

Tell us what you are looking for and we will reply. This is what we work on: what this rule enables for you — which registry to join, what to certify and by when.

no spam we reply within 48 business hours
Which are you?
Your company the website is enough — we take it from there
Tell us more
Your provinces pick none and we take all
pick one or more