El Quemado Solar Park and Annexes — photovoltaic generation (Luz del Campo SA / YPF Luz + EMESA)
The first project to enter the RIGI: a 305 MW photovoltaic solar park (31.4% capacity factor) in Jocolí (Las Heras, Mendoza), developed by Luz del Campo SA (YPF Luz + EMESA). It is built in two stages; the first installs 200 MW over 350 ha with bifacial panels. It marks the debut of the regime and of one of the few RIGI investments in Mendoza.
The projectwhat it is, the route, the owners, the works and the contractors
Who owns it
Luz del Campo S.A. (VPU, CUIT 30-71765521-0); joint venture of YPF Luz and EMESA (a Mendoza energy company) per press reports verif · Jan 8, 2025 ↗
- The works, milestone by milestone — We have not built this project’s timeline. Dated milestones with their source close it.
- Who already has a contract — We have not surveyed this project’s awards. A published contract with its source closes them.
How to supply itwhere to register, what they ask for and what they will buy
How to become a supplier
We have not built this project’s entry map. It is our gap, not a prohibition: it closes by opening the provincial register and the operator’s single window.
What it will buy, and when
Each phase buys different things at different times.
Construction of the solar farm, in two stages
under wayThe act approves USD 211,600,072 «to be developed in two (2) stages», with USD 204,544,000 in the first two years counted from the admission application, and sets Jan 30, 2027 as the deadline to complete the minimum investment. The first stage installs 200 MW over 350 hectares with bifacial panels. ⚠️ The resolution does not declare a start-up date: the closing year is the deadline to certify the investment, not the end of the works.
What it will need and has no supplier for yet
Solar farm assembly (pile driving, panel installation, DC/AC electrical works)
highA 305 MW farm across hundreds of hectares demands labor- and structure-intensive assembly: solar mounting and electrical works contractors.
Farm O&M and grid connection (transformation, evacuation line)
mediumOnce operating it requires module/inverter maintenance and the connection works to the SADI grid: O&M services and electrical EPC.
Get on board the takeoff
Tell us what you are looking for and we will reply. This is what we work on: proyectos RIGI, proveedores y datos verificados de Mendoza.
What it leaves in Mendozajobs, works, taxes, promises and the outlook
- The works that stay behind — We have not surveyed this project’s permanent works. A published size with its source closes them.
- What it already pays in taxes and royalties — We have not broken down this project’s local fiscal contribution: the primary source that sets each item still has to be opened, and an act of the State is not published on press backing.
- Who promised what — We have not surveyed the public promises about this project. A dated, verifiable commitment with its source closes them.
What could stall itrisks and how to track them
- What could stall it — We have not documented this project’s risks. An identifiable vector with its source closes them.
- How to tell whether it is advancing — We have not defined this project’s indicators: what observable fact marks its progress still has to be identified.
How we verified thisthe act, the gaps and the sources
The RIGI act, in detail
EX-2024-117037596-APN-SCEYM#MEC verif · Jan 8, 2025 ↗
Dec 16, 2024 verif · Jan 8, 2025 ↗
The act’s articles, in detail
4 facts on the commitment
55,5 % of the amount earmarked for suppliers that goes to LOCAL suppliers (own calculation) estim · Jan 8, 2025
The project's total investment (USD 211,600,072), which in this act matches the sum of what is earmarked for local and foreign suppliers verif · Jan 8, 2025 ↗
30 January 2027 to complete the minimum investment amount. verif · Jan 30, 2027 ↗
Luz del Campo S.A., tax ID 30-71765521-0, registered at Macacha Güemes 515, Floor 3, Buenos Aires City. verif · Jan 8, 2025 ↗
What we could not confirm
There are 1 in this project. Each says why it could not be confirmed and what it would take to close it.
H-01How many people the construction employs and how many stay working in operation+
No RIGI admission resolution publishes the figure: the seventeen that are published state that the company «provided the estimate of direct and indirect employment of the Project with local integration» and do not transcribe it. The official RIGI portal publishes a single figure that adds direct and indirect jobs together and does not separate the two stages, and mixing them is exactly the error the `empleo` field exists to prevent.