Despegue Neuquén Proyecto RIGI ESEN
up to date · reviewed Aug 30, 2026
Oil and gas - natural gas liquids (NGL)/Neuquén
approved

Ampliación Mega - natural gas liquids (NGL)

total investment in the act
365USD M

Expansion of the MEGA Industrial Complex to add 1,500 tonnes per day of natural gas liquids on top of the 5,500 it produces today. It touches three fronts: new facilities at the Loma La Lata separation plant (Neuquén), more transport capacity on the pipeline that crosses Neuquén, Río Negro, La Pampa and Buenos Aires, and the expansion of the Bahía Blanca fractionation plant. The resolution sets that 60% of the amount earmarked for suppliers, goods and infrastructure works goes to local suppliers, against the 20% the regime requires. Commercial operation of the expansion starts, per the instrument, on February 28, 2029, with a declared useful life of 18 years. Official portal: 792 jobs (direct and indirect).

operator
Compañía Mega S.A. Sucursal Dedicada
approving act
Resolución 1381/2026
what it will need
3procurement fronts
Summary
share among the 22 approved RIGI projects we tracktotal USD 33,041 M
Ampliación Mega1.1%
the other 21USD 32,676 M

The projectwhat it is, the route, the owners, the works and the contractors

Who owns it

Compañía Mega S.A. Sucursal Dedicada (CMSD, tax ID 30-71932893-4) verif · Aug 26, 2026

The works, milestone by milestone

Aug 26, 2026official gazette

Resolución 1381/2026 is published in the Boletín Oficial. From here the project enters the approved roster of the official RIGI portal.

Aug 25, 2026resolution

The Ministerio de Economía signs Resolución 1381/2026 approving the accession.

Jul 28, 2026rigi accession

The legal accession date to the RIGI set by the act. It is the one that starts the two-year clock of article 50, and it is 29 days earlier than publication.

Mar 18, 2026filing

Compañía Mega S.A. Sucursal Dedicada files its RIGI accession request for the expansion of a pre-existing project that had not joined the regime.

Who already has a contract

We have not worked on this yet

We have not surveyed this project’s awards. A published contract with its source closes them.

How to supply itwhere to register, what they ask for and what they will buy

How to become a supplier

We have not worked on this yet

We have not built this project’s entry map. It is our gap, not a prohibition: it closes by opening the provincial register and the operator’s single window.

What it will buy, and when

Each phase buys different things at different times.

happening now1 phase

Construction of the expansion

under way
from admission (Jul 28, 2026) → Feb 28, 2029

The act approves the investment plan for the first two years counted from notification: USD 121,613,889 in the first and USD 152,709,106 in the second, with Oct 1, 2027 as the deadline to complete the minimum investment amount. The work adds 1,500 tonnes per day of natural gas liquids on top of the 5,500 the complex already produces, and touches three fronts: Loma La Lata, the pipeline and Bahía Blanca. ⚠️ The resolution does not declare a construction start date: the starting year is the year of admission, which is when the investment plan runs.

not started yet1 phase

They are not buying any of this today. Open the phase to see the detail and arrive qualified the day it goes to tender.

Commercial operationfrom Feb 28, 2029; declared useful life of 18 yearsnot startedno items
Looking for work rather than to supply? What this project leaves the people of Neuquén (in Spanish)

What it will need and has no supplier for yet

tesisOur own reading of the project, not company-reported data.

Electromechanical assembly and detailed engineering for the Loma La Lata separation plant

high

The resolution declares new facilities at the separation plant as one of the three work fronts. It sits in Neuquén and feeds the other two, so it is the first one to be contracted. And the 60% local-supplier commitment is in the instrument itself, not in a press statement.

Supplied byassembly contractor / engineering

Pipeline works and integrity on the Río Negro stretch

high

Expanding the transport capacity of the Loma La Lata to Bahía Blanca pipeline requires working on the line in all four provinces it crosses, and Río Negro is one of them. That means welding, non-destructive testing and cathodic protection.

Supplied bypipeline contractor / non-destructive testing

Heavy-haul logistics between Neuquén and Bahía Blanca

medium

Three work fronts separated by the length of the pipeline move large equipment by road, on a corridor that Vaca Muerta construction already has under strain.

Supplied byspecial transport
Write to us · free

Get on board the takeoff

Tell us what you are looking for and we will reply. This is what we work on: proyectos RIGI, proveedores y datos verificados de Neuquén.

no spam we read every one
Which are you?
What are you looking for?
Tell us more
Your provinces Neuquén empty = all
pick one or more

What it leaves in Neuquénjobs, works, taxes, promises and the outlook

We have not worked on this yet · 3 blocks
  • The works that stay behind — We have not surveyed this project’s permanent works. A published size with its source closes them.
  • What it already pays in taxes and royalties — We have not broken down this project’s local fiscal contribution: the primary source that sets each item still has to be opened, and an act of the State is not published on press backing.
  • Who promised what — We have not surveyed the public promises about this project. A dated, verifiable commitment with its source closes them.

What could stall itrisks and how to track them

We have not worked on this yet · 2 blocks
  • What could stall it — We have not documented this project’s risks. An identifiable vector with its source closes them.
  • How to tell whether it is advancing — We have not defined this project’s indicators: what observable fact marks its progress still has to be identified.

How we verified thisthe act, the gaps and the sources

The RIGI act, in detail

Administrative file number

EX-2026-28242295- -APN-SCEYM#MEC verif · Aug 26, 2026

Accession date

28 July 2026 verif · Jul 28, 2026

Date of the act

25 August 2026 verif · Aug 25, 2026

Publication in the Boletín Oficial

26 August 2026 verif · Aug 26, 2026

The act’s articles, in detail

7 facts on the commitment
Local content set by the act

60 % of the amount earmarked for suppliers that goes to LOCAL suppliers verif · Aug 26, 2026

What that local content is calculated on

The entire investment amount earmarked for paying suppliers, goods and infrastructure works, during the project's construction and operation stages verif · Aug 26, 2026

Deadline for the commitment

1 October 2027 verif · Aug 26, 2026

Total investment declared in the act

365 USD million - total investment in the instrument (USD 365,398,669) verif · Aug 26, 2026

Assets computable under the regime

359 USD million - assets computable under the regime (USD 359,164,361) verif · Aug 26, 2026

Vehículo de Proyecto Único

Compañía Mega S.A. Sucursal Dedicada (CMSD), tax ID 30-71932893-4. verif · Aug 26, 2026

Date the application was filed

18 March 2026, as the expansion of a pre-existing project not adhered to the regime verif · Mar 18, 2026

What we could not confirm

There are 4 in this project. Each says why it could not be confirmed and what it would take to close it.

H-01How the investment splits across the three work fronts (separation, pipeline, fractionation).+

The resolution declares the total and the computable amount, not their breakdown by front.

What would close itThe investment schedule by stage that the company files with the RIGI Coordination Unit, or a statement from Compañía Mega itself.
H-02How much of the additional 1,500 tonnes a day is separated in Neuquén and how much is fractionated in Bahía Blanca.+

Neither the resolution nor the official portal breaks capacity down by plant.

What would close itThe project's technical report or Compañía Mega's production balance.
H-03When each front goes to tender and for how much.+

The act sets the minimum investment deadline (1 Oct 2027) and the commercial start date (28 Feb 2029), but not the contracting schedule.

What would close itCompañía Mega's procurement register or its calls to suppliers; there is no public single window identified for this project today.
H-04The 792 direct and indirect jobs, and how they split between construction and operation.+

The figure comes from the official portal, which publishes it as a single combined number. The resolution carries NO employment figure: it says «estimación del empleo directo e indirecto del Proyecto con integración local» without a number. The «800 jobs» the Ministerio de Economía tweeted on 26 and 28 August are that same figure, rounded.

What would close itThe employment study the company filed with its application, which is not public.
How to read the seals →   verif primary source · prob primary source pending · unconf not sufficiently backed · estim our own calculation · thesis our reading
Ignacio Aredez
Ignacio Aredez· Chief analyst
Credentials and track record →
  • 10+ years in data science for clients across Europe and the Americas
  • Certified in AI governance (ISO/IEC 42001)
  • Machine Learning (Google Cloud)
  • Registered expert with the European Commission
Fact sheet built on primary sources, with the gaps declared. Back to Neuquén