Energy - Gas (midstream)/La Pampa
approved

Perito Moreno Gas Pipeline expansion (ex-GPNK) - TGS

regime-eligible assets
513USD M

Why this project exists (systemic effect / derived demand): the expansion of the Perito Moreno Gas Pipeline (ex-GPNK) by +14 MMm3/d of capacity (confirmed in Res. 676/2026) is meant to evacuate the incremental gas from a Vaca Muerta running at full capacity - the production the investment regime is scaling has to get out one way or another. Transport demand is real and measured: the open season received bids for >32 MMm3/d, more than double what is being built. Operational before the 2027 winter; commitment of 20% to local suppliers and 40% of the amount in the first 2 years. La Pampa captures the investment because the pipeline crosses it (spillover effect), not because it joined the RIGI: the regime works cross provincial borders, no matter who produces the gas.

operator
Transportadora de Gas del Sur
approving act
Resolución 676/2026
Summary
share among the 22 approved RIGI projects we tracktotal USD 33,041 M
Perito Moreno Gas Pipeline expansion1.6%
the other 21USD 32,528 M

The projectwhat it is, the route, the owners, the works and the contractors

Who owns it

Transportadora de Gas del Sur (TGS) verif · May 13, 2026

We have not worked on this yet · 2 blocks
  • The works, milestone by milestone — We have not built this project’s timeline. Dated milestones with their source close it.
  • Who already has a contract — We have not surveyed this project’s awards. A published contract with its source closes them.

How to supply itwhere to register, what they ask for and what they will buy

How to become a supplier

We have not worked on this yet

We have not built this project’s entry map. It is our gap, not a prohibition: it closes by opening the provincial register and the operator’s single window.

What it will buy, and when

Each phase buys different things at different times.

happening now1 phase

Expansion works on Section I of the pipeline

under way
18 months from Nov 1, 2025 → April 2027

Verbatim from the act: «filed an estimated schedule of the Project’s total investment describing a works or construction term of eighteen (18) months from November 1, 2025, and declares April 1, 2027 as the estimated start of operation». It adds 14 million cubic metres per day of capacity. The minimum investment deadline is Dec 31, 2026.

not started yet1 phase

They are not buying any of this today. Open the phase to see the detail and arrive qualified the day it goes to tender.

Operation and maintenancefrom Apr 1, 2027not startedno items
Looking for work rather than to supply? What this project leaves the people of La Pampa (in Spanish)
Write to us · free

Get on board the takeoff

Tell us what you are looking for and we will reply. This is what we work on: proyectos RIGI, proveedores y datos verificados de La Pampa.

no spam we read every one
Which are you?
What are you looking for?
Tell us more
Your provinces empty = all
pick one or more

What it leaves in La Pampajobs, works, taxes, promises and the outlook

We have not worked on this yet · 3 blocks
  • The works that stay behind — We have not surveyed this project’s permanent works. A published size with its source closes them.
  • What it already pays in taxes and royalties — We have not broken down this project’s local fiscal contribution: the primary source that sets each item still has to be opened, and an act of the State is not published on press backing.
  • Who promised what — We have not surveyed the public promises about this project. A dated, verifiable commitment with its source closes them.

What could stall itrisks and how to track them

We have not worked on this yet · 2 blocks
  • What could stall it — We have not documented this project’s risks. An identifiable vector with its source closes them.
  • How to tell whether it is advancing — We have not defined this project’s indicators: what observable fact marks its progress still has to be identified.

How we verified thisthe act, the gaps and the sources

The RIGI act, in detail

Administrative file number

EX-2025-119427774- -APN-SCEYM#MEC verif · May 13, 2026

Accession date

Apr 30, 2026 verif · May 13, 2026

The act’s articles, in detail

3 facts on the commitment
Local content set by the act

20 % of the amount earmarked for suppliers that goes to LOCAL suppliers verif · May 13, 2026

What that local content is calculated on

The entire investment amount (not narrowed to the amount earmarked for suppliers) verif · May 13, 2026

Vehículo de Proyecto Único

Transportadora de Gas del Sur S.A. Sucursal Dedicada 1 (TGS SD1), tax ID 30-71881250-6, registered at Cecilia Grierson 355, Floor 26, Buenos Aires City. verif · May 13, 2026

What we could not confirm

There are 1 in this project. Each says why it could not be confirmed and what it would take to close it.

H-01How many people the construction employs and how many stay working in operation+

No RIGI admission resolution publishes the figure: the seventeen that are published state that the company «provided the estimate of direct and indirect employment of the Project with local integration» and do not transcribe it. The official RIGI portal publishes a single figure that adds direct and indirect jobs together and does not separate the two stages, and mixing them is exactly the error the `empleo` field exists to prevent.

What would close itThe employment study filed with the application, or a company release splitting the figure into construction and operation.
How to read the seals →   verif primary source · prob primary source pending · unconf not sufficiently backed · estim our own calculation · thesis our reading
Fact sheet built on primary sources, with the gaps declared. Back to the RIGI pipeline